Covid is still keeping us on lock down at the motor pool, but that just means getting more stuff done. today was lots more epoxy.
Then Soldier A had to come to grips with the fact that no matter how much he hates to paint it was time to start sucking it up and put time in the bathroom prepping and priming the case work. All together a really good day.
One couples journey to build their ultimate overlanding camper.
Search This Blog
Saturday, April 11, 2020
Friday, April 10, 2020
Tuesday, April 7, 2020
4/7/2020
Second coat of primer in the refrigerator compartment. That got followed up with more sanding of course.
Monday, April 6, 2020
4/6/2020
Sunday, April 5, 2020
4/5/2020
Finished sanding out the refer compartment and it came out really nice. Going to clean up the mess tomorrow and throw on the first coat of primer. Safe night to everyone.
Saturday, April 4, 2020
4/4/2020
With the lock down continuing we are being responsible and staying inside the motor pool compound. This isn't a bad thing though. Stuff continues to get done every day.
Today was more sanding and prep for primer. Not very glamourous but it has to get done. 😂😂
We also got the second coat of primer on in the hanging closet area.
Today was more sanding and prep for primer. Not very glamourous but it has to get done. 😂😂
We also got the second coat of primer on in the hanging closet area.
Friday, April 3, 2020
4/3/2020
Got the area that will be the hanging close and boot closet all sanded and ready for primer today. Primer tomorrow and we are still waiting for our paint samples to try out our sponge painting plan.
While all the sanding was going on we also rolled out the last three heavy coats of epoxy in the refrigerator compartment. Now that area of the floor is ready for block sanding in preparation for the floor tiles.
A quick side note on tools and equipment. The new 20 volt Dewalt cordless sander hooked to the shop vac is a real pleasure to use, unless overhead of course. It's probably 90% or more dust free. 😁
While all the sanding was going on we also rolled out the last three heavy coats of epoxy in the refrigerator compartment. Now that area of the floor is ready for block sanding in preparation for the floor tiles.
A quick side note on tools and equipment. The new 20 volt Dewalt cordless sander hooked to the shop vac is a real pleasure to use, unless overhead of course. It's probably 90% or more dust free. 😁
Thursday, April 2, 2020
4/2/2020
More progress today while dealing with the horrible things are happening on the globe. Our best wishes to everyone.
We got a lot more work done on preparing for the floor installation. Floated out the pass through areas and block sanded the first section of main floor in preparation for the final three coats of epoxy that we are going to apply.
Once all of the main floor gets the three coats we will block it out one last time and then prime it for the floor tiles.
We got a lot more work done on preparing for the floor installation. Floated out the pass through areas and block sanded the first section of main floor in preparation for the final three coats of epoxy that we are going to apply.
Once all of the main floor gets the three coats we will block it out one last time and then prime it for the floor tiles.
Subscribe to: