Crossed another threshold today! Got the first section of floor insulation and sub floor installed. Then it was time to get back on the needle scaling, which we both hate lol!
Also got a visit from the electrical wizard B. He just wanted to line out how we are going finish up this phase of the electrical system to get the ARK powered up. A huge step!
No comments:
Post a Comment