Search This Blog

Friday, February 14, 2020

2/14/2020

It seems like we always have a million things going on at once around the motor pool. But, it's valentine's Day! So, since Soldier A had to take the Dragon Wagon into town to pick up the wall tiles, he made sure to bring a treat of balloons and flowers to Soldier B. 💖 Major point score!

Back at the motor pool the boxes of wall tile had to be unloaded and cut open so they can acclimate to the environment up here. They are actually real wood not ceramic tile. 

Got right outside after that to insulate and finish the bathroom ceiling once and for all. Another milestone, be it ever so slight. 😁

Then it was back to finishing up the sanding and final coat of fairing compound so we can sand that for the multiple coats of epoxy that will be rolled over the entire inside of the bathroom, making everything completely water and mold proof. Hoping to get all of the final sanding done tomorrow and the epoxy coats on Sunday. Then the actual bath finish can start.

We rounded out the day picking a floor tile that we think will make a nice contrast to the wall wood.




No comments:

Post a Comment