Crossed another threshold today! Got the first section of floor insulation and sub floor installed. Then it was time to get back on the needle scaling, which we both hate lol!

Also got a visit from the electrical wizard B. He just wanted to line out how we are going finish up this phase of the electrical system to get the ARK powered up. A huge step!

Saturday, February 23, 2019

Thursday, February 21, 2019

2/21/2019

Got the access door cut in today. This will be the door we open to hook up our shore power as well as flip the switch to change over from shore to solar battery bank. Still gotta get that part worked out so we can be totally off grid if wanted.

Wednesday, February 20, 2019

2/20/2019

Trying to buy a house is such a pain these days. On the off chance the Ark actually becomes home Soldier A spent several hours needle scaling the compartment where the fridge goes so, we can start the floor leveling.

Tuesday, February 19, 2019

2/19/2019

Amazing how much red tape and BS is involved in buying a property these days but, it is what it is and it ate up half of our day today. Even so, we got several things done and I had Soldier A make a video.

Monday, February 18, 2019

2/18/2019

Today was about handling issues and chasing more materials. With the F150 going down yesterday we are in a bit of a pinch and have had to fall back to the ever reliable bobbed deuce. Hoping to get the electric access door installed and start wrapping up the electrical system for now.

Saturday, February 16, 2019

2/16/2019

Got the bedroom floor down today. We really like the results and might do the first floor with the same material. Also had a chance to start the finish body work on the shower pan as well.