Search This Blog

Saturday, April 11, 2020

4/11/2020

Covid is still keeping us on lock down at the motor pool, but that just means getting more stuff done. today was lots more epoxy. 

Then Soldier A had to come to grips with the fact that no matter how much he hates to paint it was time to start sucking it up and put time in the bathroom prepping and priming the case work. All together a really good day.
 

Friday, April 10, 2020

Tuesday, April 7, 2020

Monday, April 6, 2020

4/6/2020

Got everything cleaned up today and rolled out the first coat of primer in the refer compartment then back to prepping other areas.

Sunday, April 5, 2020

4/5/2020

Finished sanding out the refer compartment and it came out really nice. Going to clean up the mess tomorrow and throw on the first coat of primer. Safe night to everyone.

Saturday, April 4, 2020

4/4/2020

With the lock down continuing we are being responsible and staying inside the motor pool compound. This isn't a bad thing though. Stuff continues to get done every day.

Today was more sanding and prep for primer. Not very glamourous but it has to get done. 😂😂

We also got the second coat of primer on in the hanging closet area.

Friday, April 3, 2020

4/3/2020

Got the area that will be the hanging close and boot closet all sanded and ready for primer today. Primer tomorrow and we are still waiting for our paint samples to try out our sponge painting plan.

While all the sanding was going on we also rolled out the last three heavy coats of epoxy in the refrigerator compartment. Now that area of the floor is ready for block sanding in preparation for the floor tiles.

A quick side note on tools and equipment. The new 20 volt Dewalt cordless sander hooked to the shop vac is a real pleasure to use, unless overhead of course. It's probably 90% or more dust free. 😁
 

Thursday, April 2, 2020

4/2/2020

More progress today while dealing with the horrible things are happening on the globe. Our best wishes to everyone.

We got a lot more work done on preparing for the floor installation. Floated out the pass through areas and block sanded the first section of main floor in preparation for the final three coats of epoxy that we are going to apply.

Once all of the main floor gets the three coats we will block it out one last time and then prime it for the floor tiles.