Search This Blog

Tuesday, June 9, 2020

6/9/2020

Day two of the main flooring install. Still spending a lot of time waiting for primer to dry but, the floor is coming along nicely. We were about half way by the end of the day.

Monday, June 8, 2020

6/8/2020

So, today was the day to start the flooring. Boy did this not go as planned! 

The epoxy was very open after the sanding and it swallowed up the first coat of adhesive primer so, we put on a second coat on for good measure. Worked out very well in the end. The only down side was the dry time of better than 90 minutes per coat with the humidity being as high as it has been lately. Then there is the factor of Soldier A's short arms. He could only lay two foot sections at a time.  😂

Guess we will be doing flooring tomorrow as well.

Sunday, June 7, 2020

6/7/2020

Finally got the rest of the floor sanded as flat as it can be. Working on his hands and knees for the last few days has left soldier A walking around like a hunch back.  😂 But, it's now ready for the final flooring tomorrow.